CE111 PLC Process PDF Print E-mail
User Rating: / 0
PoorBest 
Sunday, 07 November 2010

Features:

  • Two tank liquid level/flowrate control system to provide invaluable practical experience in the use and application of programmable logic controllers

  • 6 sensor outputs/5 control inputs, each independently and simultaneously monitored or controlled by external plc to achieve required process performance

  • Fully supports ladder logic programming using IBM PC (or compatible) or hand-held programmer

  • Industry relevant training

  • Fully documented with operating instructions and a series of structured experiments, ranging from PLC fundamentals to advanced programming and operation

  • Two Year Warranty

HTML clipboard

Features:

  • Two tank liquid level/flowrate control system to provide invaluable practical experience in the use and application of programmable logic controllers

  • 6 sensor outputs/5 control inputs, each independently and simultaneously monitored or controlled by external plc to achieve required process performance

  • Fully supports ladder logic programming using IBM PC (or compatible) or hand-held programmer

  • Industry relevant training

  • Fully documented with operating instructions and a series of structured experiments, ranging from PLC fundamentals to advanced programming and operation

  • Two Year Warranty

Description:

Only a few years ago industrial machines and engineering plant containing a combination of electrical, mechanical, hydraulic and pneumatic systems would probably have been monitored and controlled by customized electronic circuits made up of discrete components such as relays, contactors, counters and timers. These were expensive, potentially unreliable, difficult to maintain and required major modification if the original operating process needed to be changed.

Programmable Logic Controllers, PLCs, have superseded these controllers. These are compact microprocessor based devices, which may be connected to a system via appropriate interfacing. They can then be programmed to input signals from a number of sensors and then respond in a logical sequential manner to produce a change in the
ON/OFF state of the actuators and indicators to achieve and maintain the operation within an envelope. The programmed is retained in memory until updated so that once set up, the operation is both continuous and repeatable. In this way, a standard PLC unit equipped with the required number of inputs and outputs can satisfy many different applications.

The PLC has been so successful in controlling systems that they are now mass produced, rugged, reliable, low cost items with many more features than their predecessors, with the additional built-in facility to be re-programmed to suit changing conditions or requirements.

PLCs are used universally in industries worldwide where ON/OFF sequential operation achieves and maintains the required operating conditions. They connect to external equipment, ranging in size and complexity from a single machine to a complete plant, via appropriate interfaces. Their operation can be programmed locally by a computer/hand-held programmer or remotely via a network.

There is a need for engineers and technicians to be familiar with PLCs and to be able to programmed, service and repair PLC based systems. Although the appearance and size of the PLC may vary from model to model, between manufacturers and in the style of programming in general, they all have the same requirement; the need to be connected to a physical system and be programmed correctly if they are to provide the quality of monitoring and control required.

The experience and skill to be able to achieve this can best be obtained through practical hands-on use of a PLC connected to a real system.

The CE111 PLC Process has been designed to provide students, and practicing engineers needing to update their skills, with the essential facilities to gain invaluable practical experience in the principles and application of programmable logic controllers. The object of the apparatus is to connect and programmed an external programmable logic controller to monitor and control the level and flowrate of water in a two-tank system.

The apparatus comprises two transparent tanks mounted one above the other on a clearly labelled front panel. A variable speed pump transfers water from a reservoir sump located in the base of the unit into the upper tank from where it can drain down under the effect of gravity to the lower tank and then back into the sump. Strategically positioned solenoid valves may be individually opened or closed to control and re-direct the movement of the water.

Both tanks include two optical level sensors, operating on the principle of total internal reflection, positioned to sense maximum and minimum water levels. An in-line flow sensor provides a pulsed output, the frequency being proportional to the flowrate and the number of pulses proportional to volume.

LED's adjacent to each input/output socket indicate the on/off supply to the pump, the open/closed status of each valve, the maximum/minimum level in each tank and the flowrate.

Low voltage control signals to the pump and solenoid valves as well as the outputs from the sensors are made at 2mm sockets mounted on the front panel.

An overflow in each tank prevents inadvertent overfilling.

The module is constructed for bench top use in conjunction with an external plc controller. An umbilical lead connects the unit to the controller to provide the power supply for the pump and valve solenoids as well as completing the return path for the inputs/outputs.

Supplied with all essential accessories, example control configuration files for use with the CE123B (see later) and a comprehensive operating/experimental manual.

Range of Experiments

The CE111 PLC Process, when used in conjunction with the CE123 PLC Trainer and optional ancillaries, has been designed to introduce students to the practical use of PLCs to monitor and control physical systems, commencing with simple investigations into the components of a typical system and then progressing in easy stages to more advanced configurations.

The operating/experimental manual supplied with the CE111 includes a series of recommended structured experiments to achieve this aim. The experimental topics covered by this equipment include; equipment familiarization, ladder logic programming and monitoring, level control, sequencing and batch processing.

The CE111 may be controlled manually from the front panel of the CE123 PLC Trainer using the appropriate switches in each input/output as required, via the optional CE123A Hand-Held Programmer or the CE123B PLC Operating Software. The switches can be used to override the actions of the CE123A and CE123B to introduce fault conditions and the effects investigated.

The experimental manual supplied with the CE111 includes a series of five structured experiments, starting with the basics of programming a PLC to full implementation of practical level control, sequencing and batch processing.

The open structure of the CE111 and CE123 allows additional experiments to be designed, which further test the users understanding of PLC operation and their applications.

Additional Equipment Required

The CE111 PLC Process requires an external PLC to achieve operation. The standard option to achieve this is the CE123 PLC Trainer. Manually operated switches on the front panel of the CE123 may be set to control the input and output states. This may be extended using the optional CE123A Hand-Held Programmer or the CE123B PLC Operating Software, both of which support industrial practice for PLCs with the CE111 PLC Process providing the ideal training tool. The CE123 switches may then be used to override the actual input/output states to simulate fault conditions.

CE123 PLC Trainer

The CE123 PLC Trainer has been designed to be fully compatible with the CE111, providing the essential facilities required investigating the techniques and practical applications of programmable logic controllers in the monitoring and control of compatible external systems.

The front panel is clearly labelled and logically presented to provide easy access to each of the 8 inputs and 6 outputs. Each input/output (I/O) comprises a 2mm socket and three push-button switches with built in LED indicators. One switch enables or disables PLC connection to the respective I/O to allow the other two to be manually set permanently high or low to override normal I/O status. This allows manual operation of the apparatus or to introduce and study the effects of system faults. LED's indicate the actual status of the PLC I/O.

A serial I/O socket mounted on the front panel enables connection to the optional CE123A Hand-Held Programmer or, using the optional CE123B PLC Software, to an IBM PC, minimum 286 AT or 100% compatible. With either option, full access is available to program the virtual normally open/closed contacts, timers, counters and shift registers to create a wide range of ladder logic functions.

Supplied with a connecting lead for the CE123A Hand-Held Programmer, CE123B PLC Operating Software, sample computer controller configuration files (for use with CE123B) and a comprehensive operating manual.

CE123A Hand-Held Programmer

An alternative to computer programming of PLC comprising an industrial hand-held module with LCD display and membrane keyboard which connects to and receives power from a PLC controller to enable ladder logic programming with up to 8 rungs each with nine contact elements and a coil element, real time monitoring and diagnostic operations. The programmed is written into battery backed RAM in the PLC. Supplied with a comprehensive technical and operating instructions.

CE123B PLC Operating Software

Software package to enable an IBM PC, 286 AT or 100% compatible, to program, real time monitor and perform diagnostic operations when connected to a CE123 PLC Trainer. Programs may be uploaded, downloaded and stored on disc. Supplied on 3.5" diskette with comprehensive technical and operating manual.

For further information on the CE123, CE123A or CE123B refer to the appropriate data sheet.

Services Required

The electrical supply for the CE111 PLC Process is supplied from the CE123 PLC Trainer via an umbilical lead.

The supply requirements for the CE123 are; Single-phase a.c. 230/115V, 1.6/3.15A, 50/60Hz, with earth.

Space Required

For satisfactory operation of a typical CE111 PLC Process and CE123 Trainer system, a bench area of approximately 1600 x 600mm is required. Any other equipment being used with the CE111/CE123 such as a computer and its peripherals in addition to that requires this. The CE111 requires a clearance of 0.9m above the work area.

Dimensions and Weight

Nett: 560 x 330 x 810mm; 25kg

Gross: 0.92m3; 74kg (approx - packed for export)

Tender Specification

An educational bench mounted apparatus to provide practical experience into the principles and application of programmable logic controllers when used with an external programmable logic controller to sense and then control the level and flowrate of water in a two-tank system.

To comprise two separate transparent tanks, with overflows, mounted vertically one above the other, each tank to include two internal reflection type optical level sensors to sense maximum and minimum water levels. A variable speed pump is to transfer water from a reservoir located in the base of the unit into the upper tank with an in-line flow sensor providing a pulsed output for flowrate and volumetric monitoring.

Solenoid operated valves to be individually opened or closed to control the flow path of the water from the upper tank back to the sump via the lower tank.

Connection for the low voltage control signals to the pump and solenoid valves as well as the outputs from the flow and level sensors to be made at 2mm sockets mounted on the front panel, the status of the inputs/outputs being indicated by adjacent LED's.

An umbilical lead to connect the unit to an external plc controller to provide the power supply for the pump and solenoid valves as well as completing the return path for the inputs/outputs.

To be supplied with all essential accessories, comprehensive operating/experimental manual and a two year parts and labour warranty.

 
< Prev   Next >
School Joomla Templates and Joomla Tutorials